Skip to content
[bmdpat]
All writing
5 min read

Six PRs Went to Two and the Devlog Was the Bug

On 2026-11-21 I cut six open pull requests to two, freed 14.6 GiB on C:, and found the missing date import behind the devlog hole.

ShareLinkedIn

TL;DR

  • C: free space went from 20.3 GiB to 34.9 GiB on 2026-11-21.
  • The missing date import left no devlog for 2026-11-12 through 2026-11-20.
  • Four named pull requests closed. PR2181 merged. PR2180 stayed open.
  • One quant post went live on attempt 22 after 19 failures.

Check my GPU

I took bmdpat from six open pull requests to two on 2026-11-21. The same morning I found why this devlog had a hole.

The day note calls the hole ten days. No devlog file exists for 2026-11-12 through 2026-11-20. config/devlog/generate_devlog.py was missing date in its datetime import. That NameError stopped the build.

Key decisions from Six PRs Went to Two and the Devlog Was the BugOpen full-size image (opens in new tab)

Why did the devlog stop writing files?

The generator threw a NameError. The file imported datetime. It did not import date. The daily run died before it wrote the entry.

I hate a quiet failure. No file showed up. No alarm named the import. The missing dates are 2026-11-12 through 2026-11-20.

Commit 58ed647bdd on main changes the publisher. It now prints the HTTP 422 body it used to hide. I still need one full generator run before I backfill those dates. The day note says to backfill only after that proof.

Which pull requests actually moved?

The day note says six open pull requests became two. It then names six outcomes. Those lines do not show two still open. I will not invent the missing name.

PR2181 merged after independent QA. The merge is d92728b1. Production returned HTTP 200.

PR2096, PR2022, and PR2171 closed as stale. PR2173 closed as superseded. That is four closes.

PR2180 got two repairs the same day. The commits are 9665d43d and f1ba46e5. Its end-to-end suite is red on five banner baselines. Those five need an owner call on the top bar. I am not calling that suite green.

The named list shows one open pull request, PR2180. The headline still says two stayed open. The second open pull request is not in the day note. Keep both facts. The gap stays open.

What did one quant post cost to ship?

One post did go live on 2026-11-21. The title is "Q4_K_M vs Q5_K_M (q4km vs q5km): Which to Download? (2026)". It was live at 12:10 CT. The check was HTTP 200 and an exact title match.

That post took attempt 22. Nineteen attempts failed. The healer went from red to green. The run used 103 agent rows and 12,678 seconds. I did not hand-edit the markdown on the attempt that passed.

The comparison is Q4_K_M against Q5_K_M. If you want the quant map, read GGUF quantization explained. For a consumer GPU run, read local LLM inference on consumer GPUs. Layer fit is the other check. See how llama.cpp n-gpu-layers works.

What else moved on the same day?

Two disk cleanup tasks came back on after the brain cut stayed in place. C: free space went from 20.3 GiB to 34.9 GiB. Fifty-five cut tasks still restart on 2026-11-23 if nobody acts.

Search was the other receipt. Average rank was 6.6. The click-through rate was 0.77% of 88,326 impressions. Google showed 275 pages. 222 of them got zero clicks. The site logged 680 clicks in 28 days, against 523 in August. The traffic grew. The walk to a product did not.

Loops for that day logged 125 human sessions, 9 CTA clicks, and 0 installs. The day note calls it the twenty-fifth day at zero.

What should you check when a daily job goes quiet?

Open the generator and read the import line before you rewrite the job. Then make the HTTP error body visible. A 422 you cannot see looks like a job that did nothing.

If your pull request list says one count and the rows say another, print both. Do not smooth the gap into a neat table.

What does your daily job hide when one name is missing from an import?

Accompanying prompt

What the prompt does: Audits an active repository pull request queue to identify stale branches, failing tests, and clear merge candidates.

Copy/paste this prompt:

Copy-ready prompt

Paste the exact block into your coding agent.

No article chrome, no footnotes, no formatting drift.

Role: Software Repository Maintainer Context: You are auditing an active git repository to clear pull request backlogs and isolate test failures. Inputs: - Repo path: __ - Open PR count: __ - Stale threshold days: __ Task: 1. Scan all open pull requests listed for the repository path. 2. Flag any branch untouched past the stale threshold days for immediate closing. 3. Group remaining active pull requests by passing tests, failing tests, and blocking design calls. Output: - Markdown table listing PR number, branch, last active date, and recommended disposition. - Exact git command list to prune closed remote branches. Constraints: - Recommend closing any superseded or abandoned branch. - Never approve pull requests with unresolved test failures.
23 lines759 chars
Ready

This prompt and every other one we publish live in the free prompt library.

Copy the block above.

Weekly measured local runs: https://bmdpat.com/5090-reports

Get the Local AI Field Kit

Four copy-ready tools now, then one evidence-backed Local AI Lab Note on Friday when there is something worth sharing.

Try the free agent run check first

Get the requested artifact now, then at most one evidence-backed Local AI Lab Note on Friday when there is something worth sharing. One-click unsubscribe. No sponsored placements. Privacy.

Written by

Patrick Hughes

I build BMD and publish measured AI runs, failure reports, and reusable checks. Nashville, Tennessee.

More writing